AccueilAccueil  ­PortailPortail  ­FAQFAQ  ­RechercherRechercher  ­S'enregistrerS'enregistrer  ­MembresMembres  ­GroupesGroupes  ­ConnexionConnexion  ­Votez pour Marine ForumVotez pour Marine Forum  
Poster un nouveau sujet   Répondre au sujetPartager | 
 

 LA NOUVELLE ZEALANDE REFUSE DEUX NAVIRES

Voir le sujet précédent Voir le sujet suivant Aller en bas 
AuteurMessage
LE BRETON
Amiral de la Flotte
Amiral de la Flotte


Masculin
Nombre de messages: 4351
Age: 38
Ville: Paris 15ème
Emploi: Fonctionnaire
Date d'inscription: 03/06/2006

MessageSujet: LA NOUVELLE ZEALANDE REFUSE DEUX NAVIRES   Dim 03 Mai 2009, 22:10

le Gouvernement Néo-zélandais a rejeté la livraison des OPV OTAGO et WELLINGTON.

Ces navires seraient trop lourd de 100 tonnes et incapables de naviguer en Antartique.

Ces navires construit en Australie font l'objet d'une médiation entre le chantier constructeur et Wellington .

_________________
kentoc'h mervel eget bezañ saotret (plutôt la mort que la souillure) devise de la Bretagne.
Revenir en haut Aller en bas
Voir le profil de l'utilisateur
lowlow
Vice-amiral d'Escadre
Vice-amiral d'Escadre


Masculin
Nombre de messages: 2581
Age: 37
Ville: à travers le monde...
Emploi: Brasseur d'air...
Date d'inscription: 11/09/2006

MessageSujet: Re: LA NOUVELLE ZEALANDE REFUSE DEUX NAVIRES   Dim 03 Mai 2009, 23:05

1100 tonnes... affraid affraid affraid

C'est assez pénalisant...
Ils sont justes bon pour aller dans les Caraïbes mais avec un navire transporteur...

Combien devaient être construits ?
Revenir en haut Aller en bas
Voir le profil de l'utilisateur
MM 40
Vice-amiral
Vice-amiral


Masculin
Nombre de messages: 1203
Age: 32
Ville: Lyon
Emploi: Enseignant
Date d'inscription: 05/11/2006

MessageSujet: Re: LA NOUVELLE ZEALANDE REFUSE DEUX NAVIRES   Lun 04 Mai 2009, 17:22

Juste deux, il me semble!
Revenir en haut Aller en bas
Voir le profil de l'utilisateur
Bernard P. A.
Vice-amiral d'Escadre
Vice-amiral d'Escadre


Masculin
Nombre de messages: 2824
Age: 66
Ville: près de Toulouse
Emploi: Retraité
Date d'inscription: 27/08/2006

MessageSujet: Re: LA NOUVELLE ZEALANDE REFUSE DEUX NAVIRES   Lun 04 Mai 2009, 18:22

MM 40 a écrit:
Juste deux, il me semble!


je confirme:deux(FC 2008). thumright
Revenir en haut Aller en bas
Voir le profil de l'utilisateur
lowlow
Vice-amiral d'Escadre
Vice-amiral d'Escadre


Masculin
Nombre de messages: 2581
Age: 37
Ville: à travers le monde...
Emploi: Brasseur d'air...
Date d'inscription: 11/09/2006

MessageSujet: Re: LA NOUVELLE ZEALANDE REFUSE DEUX NAVIRES   Lun 04 Mai 2009, 18:33

J'avais cru lire 1100 tonnes... C'est seulement de 100 tonnes ?
Revenir en haut Aller en bas
Voir le profil de l'utilisateur
LE BRETON
Amiral de la Flotte
Amiral de la Flotte


Masculin
Nombre de messages: 4351
Age: 38
Ville: Paris 15ème
Emploi: Fonctionnaire
Date d'inscription: 03/06/2006

MessageSujet: Re: LA NOUVELLE ZEALANDE REFUSE DEUX NAVIRES   Lun 04 Mai 2009, 21:41

copie de l'article

Biggest losers: NZ rejects our 'fat' frigates
Josh Gordon
May 3, 2009


NEW Zealand is claiming two Australian-built frigates are unseaworthy and refusing to accept the vessels, leaving them in limbo at the Williamstown docks.

Revelations about the dispute are embarrassing for Canberra, which has just announced a multibillion-dollar investment in naval shipbuilding as the centrepiece of a new defence white paper.

Shortcomings in the construction of the Otago and Wellington patrol vessels have also disrupted New Zealand's naval expansion, with its Defence Minister, Wayne Mapp, describing the project as "a mess".

Defence contractor BAE Systems, which inherited the deal to build the vessels after taking over defence builder Tenix last year, has confirmed to The Sunday Age that two patrol vessels ordered by New Zealand in 2004 have been rejected, and both parties are now locked in mediation.

The New Zealand Government is claiming that the vessels, each worth about $70 million, would be about 100 tonnes overweight and unable to sail in Antarctic waters, with insufficient allowance for extra equipment to be added.

"(The two vessels) are the subject of mediation between ourselves and the New Zealand Government," a BAE spokesman said.

"There are a range of issues that are yet to be settled before the customer will accept those vessels. We need to be comfortable that we are prepared to enter into an arrangement with them."

"So we are basically in negotiations and that's ongoing, but at this stage those vessels have not yet entered service."

Dr Mapp, who travelled to Melbourne in February for talks with BAE Systems, has described the project in the New Zealand media as "a mess which we are working hard to clean up". The vessels were among seven ordered as part of New Zealand's $400 million "Project Protector", all of which had been due at the end of 2007.

Of the seven vessels that had originally been ordered from Tenix, only one, the multi-role HMNZS Canterbury, is now in service, with four small patrol vessels due to become operational within weeks.

But even the Canterbury has been plagued by problems, with design flaws reportedly restricting operations.

The New Zealand Navy has also been reported as saying the Gemini rigid-hulled inflatable boats that were to be supplied with all the ships do not meet requirements and is demanding Zodiacs instead.

The Otago and the Wellington were given sea trials last year, and the ships were said to be ready for delivery, but last November their crews of 70 were sent home while "contractual issues" were negotiated.

The BAE Systems spokesman said it remained unclear when the vessels would be delivered, because the dispute had yet to be resolved.

The biggest concern remains the weight of the ships. An ice protection belt, installed so the ships can be used in the Ross Sea, would sit below the waterline when extra weight was added for operational equipment and repairs.

It was critical that the ice belt sat on the waterline, especially as a build-up of ice on the ships would add extra weight, a Defence Ministry official said.


study study

_________________
kentoc'h mervel eget bezañ saotret (plutôt la mort que la souillure) devise de la Bretagne.
Revenir en haut Aller en bas
Voir le profil de l'utilisateur
cnetof
Matelot Breveté
Matelot Breveté


Masculin
Nombre de messages: 1
Age: 49
Ville: Versailles
Emploi: Ingénieur
Date d'inscription: 05/05/2009

MessageSujet: Re: LA NOUVELLE ZEALANDE REFUSE DEUX NAVIRES   Mar 05 Mai 2009, 13:31

En complément d'info :


Specifications:


Standard Displacement: 1,600 tonnes
Length Overall: 85 metres
Beam: 14metres
Range: 6000 nautical miles
Speed: 22 knots
Complement :
Core ships company 35
Flight personnel: 10
Government agencies: 4
Additional personnel: 30
Total: 79

Armament: One 25mm Bushmaster Naval gun and two .50 calibre machine guns
Helicopter capability


OTAGO can embark the KAMAN SH-2G (NZ) Seasprite helicopter onboard, armed with torpedoes, depth charges and Maverick missiles.





OTAGO will be able to operate throughout New Zealand’s 200 mile Exclusive Economic Zone (EEZ), the Southern Ocean and the South Pacific. She will carry out a range of roles including patrolling, surveillance, search and rescue, humanitarian assistance, disaster relief, support to peacekeeping operations and sea training for the Navy.
OTAGO will conduct maritime patrols in conjunction with the P-3 Orion maritime patrol aircraft in the New Zealand EEZ, Southern Ocean and South Pacific. The surveillance tasks are primarily non-military in support of civilian agencies and involve specialist staff from government agencies such as NZ Customs and Ministry of Fisheries.
Revenir en haut Aller en bas
Voir le profil de l'utilisateur
lowlow
Vice-amiral d'Escadre
Vice-amiral d'Escadre


Masculin
Nombre de messages: 2581
Age: 37
Ville: à travers le monde...
Emploi: Brasseur d'air...
Date d'inscription: 11/09/2006

MessageSujet: Re: LA NOUVELLE ZEALANDE REFUSE DEUX NAVIRES   Mar 05 Mai 2009, 13:35

C'est la Lloyds qui considère qu'ils ne sont pas sûr... affraid
http://www.odt.co.nz/news/dunedin/8633/039otago039-fails-its-lloyds-certification


Article du 8 juin de l'année dernière... Donc le problème n'est pas nouveau....
Clipper !!! au pied et explique moi comment c'est possible !!!! Wink Very Happy


http://www.navy.mil.nz/visit-the-fleet/project-protector/


Dernière édition par lowlow le Mar 05 Mai 2009, 14:27, édité 1 fois
Revenir en haut Aller en bas
Voir le profil de l'utilisateur
clipper
Capitaine de vaisseau
Capitaine de vaisseau


Masculin
Nombre de messages: 897
Age: 33
Ville: La Ciotat
Emploi: Ingenieur naval
Date d'inscription: 09/03/2007

MessageSujet: Re: LA NOUVELLE ZEALANDE REFUSE DEUX NAVIRES   Mar 05 Mai 2009, 14:00

De ce que je lis, il y a plusieurs problèmes, le plus important étant celui du poids. 100 tonnes d'augmentation font un surpoids de 6,25 %, ce qui n'est pas si extraordinaire que ça.
C'est toute la difficulté du projet naval, celui du devis de poids. On a vite fait d'"oublier" des choses ou de se montrer très optimiste pour parvenir à tenir les specs.
Revenir en haut Aller en bas
Voir le profil de l'utilisateur
 

LA NOUVELLE ZEALANDE REFUSE DEUX NAVIRES

Voir le sujet précédent Voir le sujet suivant Revenir en haut 
Page 1 sur 1

Permission de ce forum:Vous ne pouvez pas répondre aux sujets dans ce forum
Marine forum :: Les Marines du monde :: Océanie :: Nouvelle Zélande-
Poster un nouveau sujet   Répondre au sujet